The finish line on race day
Race Day
The 5 hour finishers from the officials deck level
The rear of the finish line the day before race day with traffic running beneath
The steel security wall on the North face between the structure and the public access sidewalk
Roof skins being installed … in the rain
Upper level decking built around existing sidewalk trees
Half built
Banner fabric test rig
Model of the final structure
Detail of security wall rigging
Base Layout drawings
Detail drawing of bridge construction