The structure from above with 80’ diameter performing surface in ply, with central elevator, surrounded by packed dirt covered with a skimmed layer of concrete, painted white. Crew access tunnel at top, with flip-up “drawbridge” to be built over it, and an equipment access route below, covered and painted the day before the event.